Wastewater in Hahei is made up of two sources – Storm water/General run off and Sewage. On this page, we present background information on both.
Wastewater in Hahei is made up of two sources – Storm water/General run off and Sewage. On this page, we present background information on both.
Storm Water in Hahei is collected in the following catchments
TCDC is responsible for managing storm water in Hahei Village in the area within the green dotted line shown on this map. For more details go to click here.
Hahei has a TCDC operated municipal sewage system that provides sewage treatment to 140 properties in Hahei. The area covered shown in the map. Click here for more details.
For details of the treatment plant and its operation, you can download the RMA application prepared by Harrison Grierson, TCDC’s consultants by clicking here. Hahei Sewage System RMA Application. The application was approved and a new Consent was issued that is effective up 2030. You can download the consent here. Hahei WWTP Consent renew2030
The area of Hahei not covered by the TCDC sewage treatment plant has a variety of treatment plants, depending on when the property was developed. Older properties have septic tanks, while more recent builds have modern onsite sewage treatment plants.
In accordance with the Resource Management Act (RMA) the Waikato Regional Council (WRC) has responsibility for monitoring our coastal environment, including stream run off into the ocean.
When discharge consents are issued to organisations such as Thames Coromandel District Council, monitors discharge quality and produces reports annually on specific plans.
WRC has undertakes research in coastal water quality. You can read their most recent report here. TR 20162f07 Snapshot Of Coastal Stream Mouth Water Quality In The Coromandel Area January2fFebruary 2015 3435990
Each year, Veolia, TCDC’s plant operator, provides a detailed report of the plants performance. You can download the reports here
These reports show that the plant was compliant in 2017, but failed to meet required performance standards, as set out in the Discharge Consent, in 2018. Here is a summary
Each year, Waikato Regional Council prepares a Compliance Report. You can read the latest report here. WRC Site Compliance Report 60462 Hahei WWTP
A summary of WRC’s recommendations are;
Each year, in accordance with the RMA Consent, TCDC must arrange for Veolia and an independent adviser to report on the sewage treatment plant’s performance. Here are the reports
210617. Hahei WWTP 2021 Ecological Monitoring Report Final1.
It shows that the plant is operating in accordance with its resource consent. Their only recommendation to TCDC is
“…Veolia notify TCDC of the high coliform bacteria concentrations results so that signage can be checked and reviewed for warnings of swimming and shellfish collection in the estuary mouth.”
2020 21 Hahei WWTP Annual Report 135636 DRAFT
Appendix A 0420 0321 Hahei WWTP Annual Report 135636
Appendix B Hahei WWTP Outflow Meter
Appendix C 135636.01.01 Condition 15 Wigmore Manual Gauging Feb2019
Appendix D 1007585.1010 Hahei WWTP Data Report Final Signed (1)
Appendix E Hahei WWTP Monitoring Implementation Plan 2020 Draft
Consent Documents
Resource Consent Certificate AUTH135636.01.01
Abatement Notice Hahei Wastewater Consent 135636.01.01 18 December 2019 Doc Set # 7218014
2020-2021 Documents
2020 21 Site Compliance Letter & LETTER OF DIRECTION Hahei WWTP
2020 21 Site Compliance Report
20210-2022 Documents
2021 22 Site Compliance Letter Hahei Wastewater
2021 22 Hahei WWTP Annual Report
2021 22 Appendix A 0423 0324 Hahei WWTP Annual Report
2021 22 Site Compliance Report Hahei WWTP
2022-2023 Documents
2022 23 Hahei WWTP Site Compliance Report
2022 23 Appendix A 0423 0324 Hahei WWTP Annual Report
2022 2023 Hahei WWTP Annual Report Consent 135636
2022 23 Hahei WWTP Site Compliance Letter
2023-2024 Documents